Thursday, October 30, 2008

Third Party inspection in India

TCR Engineering Services team members undertaking Third party Inspection
Services for PermaPipe.

Physical, Chemical and Tensile test of steel rebars

TCR Engineering (www.tcreng.com) undertakes physical, Chemical and tensile test of steel rebars as per IS 1786 in India. As part of this test, the TCR laboratory personnel undertake Tensile Test (UTS,0.2%Proof, %Elongation), Bend, Rebend and complete chemical composition analysis on an optical emission spectrometer.

Assisting Welding Electrode Manufacturers

TCR Engineering Services helps the local welding electrode manufacturers in India gain the Bureau of Indian Standards (BIS) approval on 7018 grade welding electrodes as per IS:814. TCR has complete facilities to undertake the weld Tensile Test, Machining for All weld Tensile specimen, All weld Impact Test, Machining for All weld Impact specimen, Bend Test, Machining for Transverse Bend test, Chemical composition (Core Wire), Chemical composition (Weld Metal), Dimension & Tolerance, All weld Assembly preparation charges, Butt weld Assembly preparation, Running Performance Test, Test for Excess Metal Recovery, Diffusible Hydrogen Content and Radiography.

You may send your electrode samples of each sizes at following address –
TCR ENGINEERING SERVICES PVT. LTD.
Attn: Sample Receipt
Plot No. EL–182, MIDC–TTC, Electronic Zone, Behind NELCO, Mhape, NAVI MUMBAI–400 710 MAHARASHTRA, INDIA
Tel: +91–(22)– 27610921–22–23, 27612324, 27631508
Tel: +91–(22)–32936355, 65160805, 65168100
Tel: +91–(22)–65168200
Fax: +91–(22)–27612044

Do include a cover letter with your samples outlining the test required while sending it to our lab along with a DD for requisite amount as testing charges. Also send us your purchase order for this test.

Testing on Screws and Spring Washers as per IS:1573

TCR Engineering Services Metallurgical testing laboratory in India routinely conducts testing on Screws and Spring Washers as per IS:1573 - 86 Grade 2 of Tab 2. The thickness of plating can be carried out by Microscopic Method at the lab of TCR in Navi Mumbai, Maharashtra, India

Visit www.tcreng.com to know more about TCR Engineering Services.

Monday, October 06, 2008

Reverse Engineering in India

TCR Engineering can provide you complete reverse engineering solution of making gear or any other metallic component.  Starting from engineering drawings TCR can provide you full information on material of construction, heat treatment, manufacturing process, mechanical properties, case depth and case hardness, microstructure and surface finish and dimensional tolerances.  Please contact TCR with your specific requirements and give them a scope of work and their shall submit their proposal to you.  Please visit website at www.tcreng.com for more information and rates for routine testing.  Rates for specialized services are provided on request from job to job basis. 

CHEMANOL of Saudi Arabia appoints TCR as its third party inspection agency in India

As part of its expansion needs, CHEMANOL made a decision to procure its Heavy Engineering Equipments comprising of high-technology based Methyl Amines and Dimethyl Formamide plants, boilers, storage bullets, pumps etc. from India. CHEMANOL made a strategic decision in selecting an independent Third Party Inspection agency like TCR Engineering Services based in Navi Mumbai, India to professionally manage and execute their vast projects with different capital goods manufacturers spread all over India.
Mr. Rohit Bafna, Director Sales of TCR Engineering Services said, " TCR's independent, third-party quality assurance services results in improved product quality, with a reduction in customer complaints, noncompliance and product recalls. TCR Engineering Services Factory Audit service verifies the capability of a manufacturer to meet contract conditions for quality, quantity and delivery terms. Such assessments are often tailor-made as per a client's needs and requirements. By availing of this service, TCR eliminates the need for a client to be present on-site at the manufacturer's plant or factory. We applaud CHEMANOL in deciding to partner with a reliable and trustworthy Third Party Inspection Agency like TCR Engineering Services who know how to protect their Interest in a changing business environment."

Read more at

http://www.tcreng.com/newsroom/CHEMANOL-Saudi-Arabia-chooses-TCR-third-party-inspection-India.shtml

Thursday, October 02, 2008

TCR Engineering looking to hire an Accountant

TCR Engineering Serrvices is currently seeking a Collections Accountant to join the Accounting team in Navi Mumbai, India.  Qualified candidates will possess 3 – 5 years of relevant collections experience in the business environment in India.

Responsibilities:
  • Review and distribute aged receivables report(s)
  • Maintain collection report with current status of items over 60 days
  • Prepare client analysis as needed
  • Send collection letters to insured when appropriate
  • Release/update monthly future installments
  • Prepare aged receivables summary bi-weekly
  • Perform additional responsibilities as requested or assigned
Requirements:
  • Bachelor's degree in Accounting strongly preferred
  • 3 – 5 years relevant collections experience
  • Ability to work long hours
  • Proficient in MS Office products
  • Strong attention to detail and ability to multi-task
  • Excellent communication skills to effectively disseminate information
  • Ability to work in a team oriented environment
Qualified candidates should email their resumes to Human Resources, TCR Engineering. Please visit TCR Engineering's On-line Job Application Page. Cover letters should state salary requirements, or preferred salary range. TCR is dedicated to a diverse workplace.

Online Welding Vocational Video

The Welding Operator by Arthur P. Twogood from Iowa State College is an introduction into the field of welding. This 65 year old black and white movie shows most of the major fields of welding. Although gas welding has been mostly replaced by tig welding and inspection techniques have improved, some of the main welding processes are covered here.

Custom Created Welding Procedures For a Fee

 
On the above site you can download (after paying!) some good procedures such as:
 
1. WPS-FC-1 All position Flux-core on A36 plate using E71T-1 and 75-25 Ar/Co2.
2. WPS-FC-2 All position Flux-core on A36 plate using E71T-1 and 100% Co2.
3. WPS-FC-3 All position Flux-core on A240(316L) plate using E316LT-1 and 75-25 Ar/Co2.
4. WPS-FC-5 All position Flux-core on A240 (304L) plate using E308LT-1 and 75-25 Ar/Co2.
5. WPS-FC-6 All position Flux-core on A36 plate using E71T-8 without gas coverage.
6. WPS-GTAW-2 All position Tig on A240(304L) plate using ER308L with 100% Argon.
7. WPS-GTAW-2F All position dual process (Tig root/flux-core fill) on A240(304L) plate.
8. WPS-GTAW-2S All position dual process (Tig root/stick fill) on A240(304L) plate.
9. WPS-GTAW-3 All position Tig on A240(316L) plate using ER316L with 100% Argon.
10. WPS-GTAW-3F All position dual process (Tig root/flux-core fill) on A240(316L) plate.
11. WPS-GTAW-3S All position dual process (Tig root/stick fill) on A240(316L) plate.
12. WPS-SAW-1 Flat sub-arc on A-36 plate with EM12K wire and F7A2 Flux.
13. WPS-SAW-2 Flat sub-arc on A-240(304L) plate with ER308L wire and Lincoln ST 100 Flux.
14. WPS-SAW-3 Flat sub-arc on A-240(316L) plate with ER316L wire and Lincoln ST 100 Flux.
15. WPS-SMAW-1 All position stick on A36 plate with E7018 3/32,1/8,5/32.
16. WPS-SMAW-2 Flat and horizontal stick on A36 plate with E7018 3/16,7/32,1/4 size wire.
17. WPS-SMAW-3 All position stick on A240(304L) plate with E308L-15 3/32,1/8,5/32.
18. WPS-SMAW-5 All position stick on A240(316L) plate with E316L-15 3/32,1/8,5/32.
19. WPS-SMAW-7 All position stick on A240(347) plate with E347-16 3/32,1/8,5/32.
20. WPS-SPR-1 Flat and horizontal spray arc on A36 plate with E70S-6 .045,and 1/16 size wire.
21. WPS-SPR-2 Flat and horizontal spray arc on A240(316L) plate with ER316L .045,and 1/16 size wire.
22. WPS-SPR-3 Flat and horizontal spray arc on A240(304L) plate with ER308L .045,and 1/16 size wire.
23. WPS-WRP-1 NOT PREQUALIFIED--But having this procedure will insure success with the most demanding X-ray and UT (Ultra-sonic) repairs. It will also help reduce the time required to develop your own PQR (Procedure Qualification Record).